Asset Integrity and RBI Analysis
|

|
Client:
RASHPETCO Petroleum COMPANY, ROSSITTA FIELD
|
|
Scope of work:
Applying RBI on major the major pressure vessels and structure using Tischuk
software {level I & II} according to API 580,581
|
Project Description:
-
Establish written scheme of
examination for platform structure and pressure system work
-
Developing procedures for
internal inspection of onshore/offshore Pressure system at Rosetta gas plant.
-
Perform external/internal
inspection of onshore/offshore pressure equipment.
Review of P&ID’s and other drawings for pressure system.
-
Review of field inspection
reports for use in RBI analysis.
-
Collecting data on pressure
system and manage the data base for gas plant written scheme of examination and
risk based inspection.
|
|
HISTORICAL DATA
-
Equipment listing
-
Equipment data gathering
-
Equipment coding
-
Equipment classification
-
Technical coding:
-
Failure codes.
-
Delay & shutdown reason codes
-
Maintenance type codes
-
Resources codes
-
Develop equipment maintenance tasks and
procedures
-
Establish resources required to perform
task/equipment
-
Establish master maintenance plan and
relevant work order flow scheme
|
| |
|
Time Duration:
Project duration: 2 YEAR
|

Client:
GL, DUBAI.
El Rayan field
|
|
Scope
of Work:
-
Review of, drawings, project documents,
quality plans etc.
-
Review of material mill reports and
traceability
-
Review of welding procedure
specifications and witness the qualification tests
-
Review of welders qualifications
records
-
Witness welders qualification tests
-
Follow-up the structural works to
ensure compliance with GL rules and applicable codes and standards
-
Perform welding inspection
-
Review of NDT reports
-
supervise heat treatments on welds
-
Applying RBI on major the major
pressure vessels and structure using CREDO software {level I & II }
according to API 580,581
-
Review and study the client existing
documents
|
Project
Description:
-
Establish written scheme of examination
for platform structure and pressure system work
-
Developing procedures for internal
inspection of onshore/offshore Pressure system at El RAYAN field
-
Perform external/internal inspection of
onshore/offshore pressure equipment.
-
Review of P&ID’s and other drawings
for pressure system.
-
Review of field inspection reports for
use in RBI analysis.
-
Collecting data on pressure system and
manage the data base for gas plant written scheme of examination and risk based
inspection.
|
| |
|
Time Duration:
Project duration: 3 Months |

Client:
Egyptian Petrochemicals Co. [EPC Amerya, Alexandria, Egypt.
Project Description:
Preparation of Company to Achieve the ASME U-Stamp
|
|
Scope
of Work:
-
Review and study the client existing
documents Training, qualification and certification of Company NDE personnel.
-
Establishing Company written practice
in accordance with SNT-TC-1A.
-
Establishing NDE procedures (RT, UT,
MT, and PT) in accordance with ASME Code Section V.
-
Demonstrating the NDE procedures on a
mockup demo items.
-
Establishing/Reviewing of Company
Quality Manuals.
-
Reviewing NDE reports.
-
Reviewing of NDE Equipment Calibration
procedures.
-
Conducting RBI Analysis on specific
pressure vessels using AXP system (Level 1)
|
| |
|
Time Duration:
Project duration: 6 Months |

Client:
Arabic Manufacturing of Utility Equipment, (AMUE) Sadat City, Egypt
Project Description:
Performing Welding Inspection and NDT on pipe Line Fabrication.
|
|
Scope
of Work:
-
Developing WPS.
-
Preparing PQR.
-
Performing WQT for Welders and Welding
Operators.
-
Radiographic Inspection on 5% of the
total Weld Joints.
-
Ultrasonic Inspection.
-
Visual Inspection on 100% of the total
Welded Joints.
-
Welding Quality Control.
-
Performing WQT for Welders and Welding
Operators.
-
Radiographic Inspection on 5% of the
total Weld Joints.
-
Ultrasonic Inspection.
-
Visual Inspection on 100% of the total
Welded Joints.
-
Welding Quality Control.
-
Conduct inspection and corrosion data
acquisition for CREDO system.
|
| |
|
Time Duration:
Project duration: 6 Months |

Client:
Great Man-made River Authority (GMRA), Benghazi, Libya
Project
Description:
In-Service Inspection for Sarir Power Generation Station, (above-ground and
under-ground fuel oil, gas, potable water, and fire fighting pipelines –
different storage tanks – foam tanks)
|
|
Scope
of Work:
-
Review and study the client existing
documents:
-
Engineering documents, drawings and
specifications.
-
Vendors manuals
-
Manufacturers' catalogues.
-
Historical Data
-
Equipment listing
-
Equipment data gathering
-
Equipment coding
-
Equipment classification
-
Technical coding: Failure codes, Delay
& shutdown reason codes, Maintenance type codes, Resources codes
-
Establish resources required to perform
task/equipment
-
Establish master maintenance plan and
relevant work order flow scheme
-
Performing NDT on tanks and pipe lines
|
| |
|
Time Duration:
Project duration: 12Months |

Client:
San Stefano Complex Hotel Building, Alexandria,
|
|
Scope of Work:
Review and study the client existing documents
Performing NDT on the steel structure.
|
Project Description:
Third Party Inspection (TPI) to control all manufactured Steel Structure
Built-up Sections and Trusses. |
|
Time Duration:
Project duration: 3 years |

Client:
National Steel Fabrication Co. [NSF] 6th of October City, Cairo, Egypt.
Project Description:
Preparation of Companies to Achieve the ASME U-Stamp
|
|
Scope
of Work:
-
Training, qualification and
certification of Company NDE personnel.
-
Establishing Company written practice
in accordance with SNT-TC-1A.
-
Establishing NDE procedures (RT, UT,
MT, and PT) in accordance with ASME Code Section V.
-
Demonstrating the NDE procedures on a
mockup demo items.
-
Establishing/Reviewing of Company
Quality Manuals.
-
Reviewing NDE reports.
-
Reviewing of NDE Equipment Calibration
procedures.
-
Representing the company during the
ASME Joint
|
|
|
|
Time Duration:
PROJECT DURATION: 3 MONTHS |
|